The safety of the communities, people, and the environment is at the heart of our project.
We are committed to being good neighbors and considering feedback from all relevant stakeholders into both the proposed route and the project’s overall design.
Safety is at our core and the Blackfin Pipeline’s highest priority.
Once completed, highly trained pipeline controllers use advanced technology to carefully monitor our pipelines — 24/7/365 — and complete regular aerial and ground safety inspections along the route.
We employ a dedicated team of safety and environmental professionals who build and maintain stringent safety programs and practices, and every single employee and contractor has the authority to stop work they believe is unsafe.
We are dedicated to pipeline safety, use high-quality steel pipe, and ensure our pipelines meet or exceed the applicable standards for pipeline construction and operation. Every employee and contractor has the authority to stop work they believe is unsafe.
Environmental Study. We are thoroughly surveying the pipeline’s route and are working with federal agencies to ensure there are no adverse effects to threatened or endangered species, or the habitat, during the construction and operation of the Blackfin Pipeline.
Environmental Permits. Once our environmental and cultural surveys are completed, we will begin the process for securing the necessary environmental permits from State and local agencies. The surveys will gather significant amounts of environmental data through field study and analysis, which we provide to regulators and permitting agencies as required.
Safe Construction. The safety of our personnel, landowners, and the surrounding communities is of the utmost importance throughout the construction process. Utilizing industry best practices, we ensure the Blackfin Pipeline is completed in a safe and secure manner.
Pipeline Inspection. Regular aerial surveillance of the line is performed to look for potential risks to the pipeline, including encroachment or other unauthorized activity on the right-of-way, as well as any other potentially concerning surface conditions along the pipeline. We also conduct regular foot patrol inspections along the entire route.
Pipeline Markers. Pipeline markers installed within line-of-sight on the pipeline route noting the general location of the pipeline, including at road, property, and creek crossings.
Remote Shutdown. Highly trained pipeline controllers can take real-time and nearly instantaneous action to remotely shut down a pipeline system if a problem is suspected, and the line can only be returned to operation after field personnel conduct a thorough visual inspection and correct the problem.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.